The listing facts are current enough for an initial property review.
30 Macombs Pl Apt 24
Market Insights
$274/sqft vs a nearby median of $308/sqft.
- -11% versus the nearby median price per square foot.
- Price history is limited, so current comps matter more than trend alone.
- 800 sqft creates a usable price-per-square-foot read.
Pricing Read
Asking price is about 11.4% below the fair value — likely to draw competing offers if it's still on market.
- Open Class C HPD violations−$15k −6.0%
- Transit access+$6k +2.5%
- Pre-war character+$6k +2.5%
Property Read
The asking price per square foot is below the nearby median, which can be worth a closer comp check.
Price history is still limited; review again as more market activity becomes available.
Generate a buyer-agent read of this listing — pricing, risks, comp check, and negotiation leverage. Takes a few seconds.
Generated from the facts shown on this page and nearby market data. Not a professional appraisal.
Listing Details
- Days on market
- 35 days
- Last price change
- No change recorded
- Listed
- Apr 7, 2026
- Photos
- 20 photos
- Property type
- coop
- Status
- for sale
Photos
Building Facts
- Year built
- 1920
- Stories
- 6
- Total units
- 24
- Residential units
- 24
- Building area
- 12,390 sqft
- Lot size
- 4,694 sqft
- Land use
- Multi-family walk-up buildings
- Building class
- C6
From NYC public records where available.
Price History
Public Records
13 total recorded against the building
51 class C (immediately hazardous)
Tax-lot deed, mortgage, and transfer records on file
Top: heat/hot water
Top complaint types in ZIP 10039
- HEAT/HOT WATER4,517
- Noise - Residential3,374
- UNSANITARY CONDITION1,378
- Noise - Street/Sidewalk826
- PLUMBING817
Recent DOB
- Nov 14, 2025V-DOB VIOLATION - ACTIVE · LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
- Sep 23, 2024V-DOB VIOLATION - ACTIVE · LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
- Jun 20, 2023V-DOB VIOLATION - ACTIVE · LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
- Jun 20, 2023V-DOB VIOLATION - ACTIVE · LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
Recent HPD
- Apr 29, 2026Class A · (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD S WEBSITE, WWW.NYC.GOV\HPD, SEARCH BE...
- Apr 7, 2026Class B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 5th ROOM FROM EAST LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST
- Apr 7, 2026Class C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING IN THE 5th ROOM FROM EAST LOCATED AT APT 1C, 1st STORY, 2nd A...
- Apr 7, 2026Class B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST
Sourced from NYC Open Data (DOB, HPD, ACRIS). Updated as the city republishes — check the original source for live status.