The listing facts are current enough for an initial property review.
382 Central Park W Apt 15T
Market Insights
$1248/sqft vs a nearby median of $1355/sqft.
- -7.9% versus the nearby median price per square foot.
- Price history is limited, so current comps matter more than trend alone.
- 600 sqft creates a usable price-per-square-foot read.
Pricing Read
Asking price is about 4.8% below the fair value — likely to draw competing offers if it's still on market.
- Open Class C HPD violations−$49k −6.0%
- Transit access+$33k +4.0%
- Mid-century building era−$12k −1.5%
Property Read
The asking price per square foot is below the nearby median, which can be worth a closer comp check.
Price history is still limited; review again as more market activity becomes available.
Generate a buyer-agent read of this listing — pricing, risks, comp check, and negotiation leverage. Takes a few seconds.
Generated from the facts shown on this page and nearby market data. Not a professional appraisal.
Listing Details
- Days on market
- 20 days
- Last price change
- No change recorded
- Listed
- Apr 22, 2026
- Photos
- 13 photos
- Property type
- condos
- Status
- for sale
Photos
Building Facts
- Year built
- 1961
- Stories
- 19
- Total units
- 414
- Residential units
- 414
- Building area
- 7.43 ac
- Lot size
- 3.12 ac
- Land use
- Multi-family elevator buildings
- Building class
- R4
From NYC public records where available.
Price History
Public Records
67 total recorded against the building
7 class C (immediately hazardous)
Tax-lot deed, mortgage, and transfer records on file
Top: heat/hot water
Top complaint types in ZIP 10025
- HEAT/HOT WATER3,614
- Noise - Residential2,560
- Illegal Parking2,187
- Noise - Street/Sidewalk1,582
- UNSANITARY CONDITION1,342
Recent DOB
- Apr 6, 2018V*-DOB VIOLATION - DISMISSED · LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
- Apr 6, 2018V*-DOB VIOLATION - DISMISSED · LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
- Jan 26, 2018V*-DOB VIOLATION - DISMISSED · ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
- Jan 26, 2018V*-DOB VIOLATION - DISMISSED · ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
Recent HPD
- Aug 30, 2025Class B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10SQ.FT AT NORTH WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 6P, 6th STOR...
- Aug 30, 2025Class B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 7J, 7th STORY, 1st APART...
- Aug 30, 2025Class B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM NORTH LOCATED AT APT 6P, 6th STORY, 4th APARTMENT FROM SOUTH AT ...
- Aug 30, 2025Class B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 7J, 7th STORY, 1st A...
Sourced from NYC Open Data (DOB, HPD, ACRIS). Updated as the city republishes — check the original source for live status.