The listing facts are current enough for an initial property review.
400 E 52nd St Apt 14G
Market Insights
$848/sqft vs a nearby median of $722/sqft.
- +18% versus the nearby median price per square foot.
- Price history is limited, so current comps matter more than trend alone.
- 625 sqft creates a usable price-per-square-foot read.
Pricing Read
Asking price is about 16.6% above where comps + adjustments land — there is room to negotiate.
- Days-on-market gravity−$14k −3.0%
- Pre-war character+$11k +2.5%
- Open DOB violations−$5k −1.0%
- Visible condition issues−$5k −1.0%
- Transit access+$2k +0.5%
Property Read
The property is priced above the nearby median per square foot, so condition, building quality, and exact location need to justify the higher ask.
Price history is still limited; review again as more market activity becomes available.
Generate a buyer-agent read of this listing — pricing, risks, comp check, and negotiation leverage. Takes a few seconds.
Generated from the facts shown on this page and nearby market data. Not a professional appraisal.
Listing Details
- Days on market
- 483 days
- Last price change
- No change recorded
- Listed
- Jan 15, 2025
- Photos
- 9 photos
- Property type
- coop
- Status
- for sale
Photos
Building Facts
- Year built
- 1931
- Stories
- 17
- Total units
- 152
- Residential units
- 151
- Building area
- 4.11 ac
- Lot size
- 13,425 sqft
- Land use
- Multi-family elevator buildings
- Building class
- D4
From NYC public records where available.
Price History
Public Records
62 total recorded against the building
17 total recorded
Tax-lot deed, mortgage, and transfer records on file
Top: illegal parking
Top complaint types in ZIP 10022
- Illegal Parking1,366
- Noise770
- Street Condition728
- HEAT/HOT WATER650
- Noise - Residential557
Recent DOB
- Oct 31, 2025V-DOB VIOLATION - ACTIVE · C-CONSTRUCTION OTHER OPTIONAL
- Oct 31, 2025V-DOB VIOLATION - ACTIVE · C-CONSTRUCTION OTHER OPTIONAL
- Feb 22, 2024V-DOB VIOLATION - ACTIVE · FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
- May 3, 2023V*-DOB VIOLATION - DISMISSED · BENCH-FAILURE TO BENCHMARK NONE
Recent HPD
- Mar 15, 2023Class A · (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD S WEBSITE, WWW.NYC.GOV\HPD, SEARCH BE...
- Jun 3, 2019Class B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL IN THE BATHTUB IN THE BATHROOM LOCATED AT APT 12D, 12th STORY, 1st AP...
- Jun 3, 2019Class A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL APPRX 2 SQUARE FEET IN THE BATHROOM LOCATED AT APT 12D, 12th STORY, 1st APARTME...
- Jun 3, 2019Class C · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTE...
Sourced from NYC Open Data (DOB, HPD, ACRIS). Updated as the city republishes — check the original source for live status.