The page is useful for research, but the status and price should be verified before acting.
666 W End Ave Unit 1959
Market Insights
$10/sqft vs a nearby median of $8/sqft.
- +25% versus the nearby median price per square foot.
- Price history is limited, so current comps matter more than trend alone.
- 387 sqft creates a usable price-per-square-foot read.
Property Read
The property is priced above the nearby median per square foot, so condition, building quality, and exact location need to justify the higher ask.
Price history is still limited; review again as more market activity becomes available.
Generate a buyer-agent read of this listing — pricing, risks, comp check, and negotiation leverage. Takes a few seconds.
Generated from the facts shown on this page and nearby market data. Not a professional appraisal.
Listing Details
- Days on market
- 295 days
- Last price change
- No change recorded
- Listed
- Jul 21, 2025
- Photos
- 17 photos
- Property type
- apartment
- Status
- for rent
Photos
Building Facts
- Year built
- 1927
- Stories
- 22
- Total units
- 1
- Building area
- 6.41 ac
- Lot size
- 16,050 sqft
- Land use
- Multi-family elevator buildings
- Building class
- H6
From NYC public records where available.
Price History
Public Records
143 total recorded against the building
14 class C (immediately hazardous)
Tax-lot deed, mortgage, and transfer records on file
Top: heat/hot water
Top complaint types in ZIP 10025
- HEAT/HOT WATER3,614
- Noise - Residential2,558
- Illegal Parking2,187
- Noise - Street/Sidewalk1,578
- UNSANITARY CONDITION1,339
Recent DOB
- Nov 14, 2025V*-DOB VIOLATION - DISMISSED · LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
- Nov 14, 2025V*-DOB VIOLATION - DISMISSED · LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
- Oct 20, 2022V*-DOB VIOLATION - DISMISSED · FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
- Oct 21, 2021V-DOB VIOLATION - ACTIVE · E-ELEVATOR ELEVATORREQUIRED
Recent HPD
- Apr 16, 2026Class B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPOR...
- Apr 16, 2026Class B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPOR...
- Apr 16, 2026Class B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPOR...
- Apr 16, 2026Class B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPOR...
Sourced from NYC Open Data (DOB, HPD, ACRIS). Updated as the city republishes — check the original source for live status.